Paralleling commissioning on three paralleled transformers with BECKWITH tapchanger controls in Tanzania.
![]()
Testing and commissioning of electrical equipment at Minera los Pelambres.
Testing and commissioning of the Simple Cycle Power Barge in Curacao.
Professional Engineering Services SABIYA GAS TURBINE POWER STATION.
Conceptual Engineering study for San Nicolas sugar mill plant.
PSS study and settings of the Laredo Energy Center.
-Conceptual Engineering for connection of New Hope Power Plant to Okeelanta Sugar Mill. (Extension of the 132 /13.8 kV system).
Feasibility Study to Determine the Possibility of Installing a solar plant in New Mexico
Progress Energy: Relay setting calculation for SHEARON HARRIS NUCLEAR POWER PLANT.
Design of shielding and grounding system for Effluent Tank at the plant of Allied New Technologies in Fort Pierce
Arc Flash Hazard Study at the Fort Pierce Facility.
PSS study and settings of the Laredo Energy Center.
Technical support for site acceptance tests and commissioning services at the 115 kV Viaducto Transmission Center, PREPA Substation.
Java-Bali Power system studies review

Design of the electrical power distribution system, and the grounding and shielding system for the Allied New Technologies, chemical plant.

Site acceptance tests - SAT San Juan combined cycle plant unit 5 & 6.

Engineering and Design services for the installation of standby generators at Winn-Dixie Stores in South Florida.

Settings calculations for most of their relays to be installed on their customers facilities, for example Arjay and Hawaii Electric Light Co. The settings have been calculated for most of their relays including the M-3410A, M-3425A, and M-3311

Measurement of harmonic performance of the ABB – 500kV, -140MVAR/+575MVAR Static VAR Compensator (SVC) at Black Oak Substation, Maryland.

* Contracted through the Joint Contracting Command – Iraq/Afghanistan - Gulf Region Division of the USACE and Audited by the DCAA.

Modernization of the 23 kV-480 V electrical distribution system. The results involved significantly increased reliability and maintainability resulting in a cost avoidance of $300K per hour due to potential failure.

Engineering and design services for the installation of a stand by generator and UPS System at the City Hall Annex Building

Engineering and Design services for the installation of a 480V/2000A feeder for a new production line.

Consulting services to optimize the reliability of the power system at the Superintendence of Operations Facilities in the Department of Meta.

Design and construction supervision of 500/230 kV San Marcos, Uraba, and Cerromatoso substations, including associated bays at neighbor substations.
Supply and construction of 15 kV Metalclad switchgear and associated 13.8kV double circuit feeder line. These feeder lines are intended to provide 45 MVA to a new process plant for the cement facility expansion under construction.
Three major activities accomplished for the 235 MW combined cycle power plant of TermoEmcali in Colombia for InterGen and Bechtel: i) complete design of the 115 kV switchyard to receive the total generation of the plant; ii) testing and commissioning of the overall control and protective equipment associated to both, the plant and the substation; iii) warranty management and handover to the local utility.